Skip to main content
OKTO PSA

Interactive demo · version 2.365.0

An order, from drawing to first article.

OKTO PSA for manufacturing: software that carries a quote request through to the quote, the work order, then the first article.

Step into the shoes of the production manager at Usinage Cap-Lumière for three minutes. Tap the pulsing dots, or move ahead with Next. All data is fictitious.

Learn more:Software for manufacturers Compare the software Pricing

14 steps
3 minutes
100 % fictitious data
your-company.oktopsa.ca
Fictitious data

The companies, clients, employees, addresses and amounts in this demo are made up. No real data is shown.

The 14 steps of the tour

The demo tour, written out. Read it here, then open the tour to click through the screens yourself.

  1. The shop at a glance

    The Manufacturing home shows inventory, machine hours, machine use, purchases by supplier, orders waiting to be received and payments due. No ticket cards: it is built for a shop.

    The payoff: You see a material shortage before it stops a machine.

  2. The right client, at the right time

    One click on Enrich and OKTO PSA fetches the company’s public data: registry, website, headcount, key people. The Signals tab gathers the buying signs found by OKTO Leads, such as hiring or an expansion, with their source and weight. The account turns Hot and the bell lets you know.

    The payoff: You call the client when they are ready to buy.

  3. The customer’s drawing lands in a request

    The email from Remorques Grand-Héron becomes a request of type “Quote request from drawing”, with the PDF attached and the Quote request category. One click converts it into an opportunity: sales take over without retyping anything.

    The payoff: No quote request sits forgotten in an inbox.

  4. 3D files arrive without email

    The 3D model is too big for email. Send Patrick an OKTO Transfert drop link: he uploads his files without an account, even very large ones. Each file goes through the antivirus, then attaches to the request. The link expires on its own.

    The payoff: No more drawings lost in personal sharing links.

  5. From estimate to confirmed order

    The quote follows the manufacturing sales stages, from quote request to production. The product is sold per unit, with GST and QST calculated to the cent. Once accepted in the portal, it converts into a customer order and the order’s project is created.

    The payoff: The price promised to the customer follows the order to the shop floor.

  6. Milestones, budget and time by charge code

    The project carries the customer, the order and the quote value, split into milestones. Every hour entered has its charge code: Shop labour, Design or Machine time, which is billed separately. The effort budget updates with each entry.

    The payoff: Machine hours no longer get lost in labour.

  7. The machine booked for the project, with no double booking

    Pick the project and the dates, then check the machines. OKTO PSA checks each one: the machining centre is free, the welding station is already taken by another project. A scheduled maintenance cannot be overridden.

    The payoff: Two projects no longer fight over the same machine on the same day.

  8. Received material goes into inventory

    The supplier order for the 4140 steel arrives. Receiving is done line by line, with the location and the lot number: the parts go into inventory and the movement is logged. The project then moves from “Waiting on material” to “In production”.

    The payoff: The stock on screen is what is really on the shelves.

  9. The supplier invoice reads itself

    The invoice from Métaux Riveneuve lands in the accounts payable mailbox. OKTO PSA reads it, checks the totals and taxes, and suggests the category, expense account, project, purchase order and due date, each with its reason. The order, the receipt and the invoice match: you accept.

    The payoff: No more supplier invoices retyped by hand.

  10. First-article inspection, measured and signed

    The template sets the dimensions, tolerances and signatures. An out-of-tolerance reading is still allowed, but it is flagged on screen and in the report. Technical signatures come first. Once signed, the report is locked and a correction creates a new version.

    The payoff: Quality proof sits in the project file, not in a binder.

  11. The delivery slip, signed remotely

    Open the delivery slip in OKTO PDF. The Form tab places the fields to fill: signature, name, date. “Send with OKTO Sign” goes out with the fields already in place. The customer signs from their phone, and the signed PDF comes back to the project.

    The payoff: Proof of delivery is on file the same day.

  12. The customer follows everything, and pays online

    Patrick sees his request, his documents and his invoices in his portal. The invoice appears like the PDF, with the balance, the due date and the Pay button. One click, and the payment is recorded in OKTO PSA.

    The payoff: Fewer “where is my order?” calls, and faster payments.

  13. It speaks shop floor, and it counts

    Ask a question in plain language. OKTHAV uses manufacturing words, calculates across your whole database and shows where its numbers come from. It does nothing without your approval.

    The payoff: Answers that used to need a report take ten seconds.

  14. Your shop, in OKTO PSA

    You just followed an order from the first buying signal to payment. We can show you yours, with your parts, your machines, your charge codes and your taxes.

    The payoff: A 30-minute meeting, no commitment.

Frequent questions

The questions we get asked

Your question is not here?

Write to us. A person in Trois-Rivières answers, within one business day.

Ask your question